If you are accessing this story via Facebook but you are a subscriber then you will be unable to access the story. Facebook wants you to stay and read in the app and your login details are not shared with Facebook. If you experience problems with accessing the news but have subscribed, please contact subscriptions@thestrayferret.co.uk. In a time of both misinformation and too much information, quality journalism is more crucial than ever. By subscribing, you can help us get the story right.
Already a subscriber? Log in here.
02
May 2024

North Yorkshire Council has given an update on work to repair the A59 at Kex Gill.
The road, which is the main route between Harrogate and Skipton, closed suddenly on February 2 when a crack appeared on the verge.
Repair work costing £750,000 began on April 15.
Karl Battersby (pictured above), the council’s corporate director of environment, said in a 57-second video yesterday it was still hoped the road would re-open by the end of June.
He said:

Machinery on site

Mr Battersby said a piling rig was putting large metal poles into the side of the road to stabilise it. The road will then be resurfaced.
He added:
Irish construction firm Sisk, which is carrying out the nearby £68.8 million three-mile realignment, was appointed to oversee the repair work, with Ivor King carrying out the piling.
The crack was caused by a landslip which the council attributed to wet weather but some residents have claimed it is due to the impact of the realignment on the landscape.
0