£3.5 million remediation work underway at Ripon leisure centre
by
Jun 26, 2023
Work underway at the the leisure centre site

Remediation works costing £3.5 million are underway at the Ripon leisure centre building which closed in late April.

North Yorkshire Council’s assistant director for culture, leisure, archives and libraries, Jo Ireland, said:

“We can confirm the ground stabilisation works at the former Ripon Leisure Centre have now started.”

Hoardings and fencing have been put in place around the 28 year old leisure centre building.

He added:

“These works came about following the discovery of a void underneath part of the original leisure centre.

“The void is understood to have been present for a number of years and was discovered when the reinforced concrete slab, which provides the foundation for the new swimming pool, was cast.

“By addressing these historic issues, it allows us the opportunity to ensure future generations will be able to access modern sport and leisure facilities in their city for many years to come.

“Once the works have been completed the original leisure centre facility can be refurbished as planned – which includes an extended gym, two new activity studios, a spin studio as well as meeting facilities – and complement the 25 metre, six-lane swimming pool that opened last year.”

Work is scheduled to go on until spring 2024 and in the meantime a temporary gym will remain in use on the car park near the entrance to the  Jack Laugher Leisure and Wellness Centre.

The £300,000 facility, operated by Brimhams Active on behalf of North Yorkshire Council, includes Technogym equipment.

Customers are able to use the changing and shower facilities at the swimming pool as well as the sauna and steam suite. Group exercise classes continue to be provided at Hugh Ripley Hall.


Read more:



Download the FREE Stray Ferret app here to access the latest news, competitions and offers.