This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities...
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
    • Politics
    • Transport
    • Lifestyle
    • Community
    • Business
    • Crime
    • Environment
    • Health
    • Education
    • Sport
    • Harrogate
    • Ripon
    • Knaresborough
    • Boroughbridge
    • Pateley Bridge
    • Masham
  • What's On
  • Offers
  • Latest Jobs
  • Podcasts

Interested in advertising with us?

Advertise with us

  • News & Features
  • Your Area
  • What's On
  • Offers
  • Latest Jobs
  • Podcasts
  • Politics
  • Transport
  • Lifestyle
  • Community
  • Business
  • Crime
  • Environment
  • Health
  • Education
  • Sport
Advertise with us
Subscribe
  • Home
  • Latest News

We want to hear from you

Tell us your opinions and views on what we cover

Contact us
Connect with us
  • About us
  • Advertise your job
  • Correction and complaints
Download on App StoreDownload on Google Play Store
  • Terms and Conditions
  • Privacy Statement
  • Comments Participation T&Cs
Trust In Journalism

Copyright © 2020 The Stray Ferret Ltd, All Rights Reserved

Site by Show + Tell

Subscribe to trusted local news

In a time of both misinformation and too much information, quality journalism is more crucial than ever. By subscribing, you can help us get the story right.

  • Subscription costs less than £1 a week with an annual plan.

Already a subscriber? Log in here.

09

Oct 2023

Last Updated: 09/10/2023
Transport
Transport

Five-week road closure begins today at A59 Kex Gill

by Calvin Robinson Chief Reporter

| 09 Oct, 2023
Comment

0

kexgillroad-2
A59 at Kex Gill.

A five-week road closure has come into effect on the A59 at Kex Gill between Harrogate and Skipton today.

North Yorkshire Council has closed the road between Church Hill and Pace Gate, leading to lengthy diversions.

The council has said the closure will enable it to carry out resurfacing, essential stabilising work to the slope of the existing road as well as drainage repairs, gully-clearing, cat’s eyes replacement and maintenance of ground monitoring equipment.

A diversion will take drivers through Pool in Wharfedale and Otley before re-joining the A59. A full diversion route can be found on the North Yorkshire Council roadworks map.

The DalesBus 59 between Harrogate and Skipton will also run on an amended timetable from October 14 until November 11.

Buses will run twice a day in each direction on Saturdays only during the period of the closure and will operate from Harrogate through Otley and Ilkley before joining the A59 near Chelker Reservoir.

Work will take place on a section of the A59 which is next to the council’s £68.8 million Kex Gill re-route project.

Council officers will also be carrying out essential stabilising works to the slope of the existing road as well as drainage repairs, gully-clearing, refreshing lining, replacing cat’s eyes and maintenance of the ground monitoring equipment.

Cllr Keane Duncan, executive councillor for highways and transport at the council, said:

“Kex Gill has a history of landslips, and the route has had to be closed a total of 12 times in the past 22 years. We must stabilise the slope near the existing road to avoid any lengthy closures over the next two years whilst the new road is constructed.”






Read more:



  • Site cleared ahead new road being built at A59 Kex Gill

  • Concern about inflation on £68.8m Kex Gill road scheme