This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities...
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
    • Politics
    • Transport
    • Lifestyle
    • Community
    • Business
    • Crime
    • Environment
    • Health
    • Education
    • Sport
    • Harrogate
    • Ripon
    • Knaresborough
    • Boroughbridge
    • Pateley Bridge
    • Masham
  • What's On
  • Offers
  • Latest Jobs
  • Podcasts

Interested in advertising with us?

Advertise with us

  • News & Features
  • Your Area
  • What's On
  • Offers
  • Latest Jobs
  • Podcasts
  • Politics
  • Transport
  • Lifestyle
  • Community
  • Business
  • Crime
  • Environment
  • Health
  • Education
  • Sport
Advertise with us
Subscribe
  • Home
  • Latest News

We want to hear from you

Tell us your opinions and views on what we cover

Contact us
Connect with us
  • About us
  • Advertise your job
  • Correction and complaints
Download on App StoreDownload on Google Play Store
  • Terms and Conditions
  • Privacy Statement
  • Comments Participation T&Cs
Trust In Journalism

Copyright © 2020 The Stray Ferret Ltd, All Rights Reserved

Site by Show + Tell

Subscribe to trusted local news

In a time of both misinformation and too much information, quality journalism is more crucial than ever. By subscribing, you can help us get the story right.

  • Subscription costs less than £1 a week with an annual plan.

Already a subscriber? Log in here.

13

Nov 2020

Last Updated: 13/11/2020
Transport
Transport

Emergency sewer work to close road in centre of Ripon

by Tamsin O'Brien

| 13 Nov, 2020
Comment

0

Kirkgate at its junction with Market Place East will be closed to vehicles. Yorkshire Water says the work will start on Monday and continue during lockdown but will then be suspended for the Xmas period.

5c7ccf45-a673-4864-b373-f86f080992ac

Emergency work to repair a collapsed sewer in the centre of Ripon begins on Monday.

Kirkgate at its junction with Market Place East will be closed to vehicles, but there'll be access for residents and businesses up to the point of the working area.  A parking suspension on a section of Kirkgate will be also in place.

The current one-way system will be suspended while the road closure is in operation. All vehicles using Market Place East will be diverted along Market Place South to Westgate, Park Street, Firby Lane, Somerset Row, and Water Skellgate.

The repairs are being carried out during lockdown to minimise disruption and are due to end on December 2.

Yorkshire Water has said any remaining work will be postponed until the New Year to enable local businesses to welcome customers over the Christmas period.




Read More: 



  • Nidd farming sisters help save bull from drowning

  • Bishop of Ripon:  "support creation of sports village" 






Yorkshire Water’s Mark Allsop said:

The emergency repair needs to begin as soon as possible. Work of this nature does take time and by starting during this lockdown period we hope to limit the disruption experienced by residents to a minimum.
“Throughout the works, existing water and waste water services will not be impacted, and we’d like to thank people in advance for their patience while this work is taking place.”