A collection of grade II* listed Georgian garden buildings in the grounds of Ripley Castle has been removed from the Heritage at Risk Register after more than 20 years.
The register, compiled annually by the public body Historic England, lists historic places at risk of being lost as a result of neglect, decay or inappropriate development.
In a press release today, Historic England said its grants of over £440,000 had helped fund extensive repair work to the orangery (palm house) fire engine house and adjoining pavilions and bothies (potting sheds) in the grounds of the 15th-century castle.

Ripley castle gardens. Pic Historic England
It added they will be used for education and volunteer activities with school children and the local community, including visits and outdoor theatre.
Sir Thomas Ingilby, owner of Ripley Castle, said:
“I’m extremely grateful to Historic England for the help and support over many years which have helped to repair these handsome historic garden buildings which form the centrepiece of Ripley Castle’s beautiful grounds.
“Their restoration will improve the experience of the tens of thousands of people who visit every year. It will also provide educational and leisure opportunities for local schools and groups.”

Ripley Castle. Pic Historic England
The garden buildings are thought to have been designed around 1785 by York-born architect William Belwood.
In 1817-18, a glass roof was added to the orangery to convert it into a palm house. Designed to grow tropical plants, palm houses were a popular status symbol in the 19th century.
The fire engine house is still home to the hand-pulled fire engine which helped protect the castle and village, while a collection of giant ferns now lives in the orangery.
Repair work, which started during the pandemic, included replacing the iron frameworks for the orangery, as well as removing the balustrades, replacing the glass and masonry.
The Temple of Victory at Allerton Park and the Church of St James in Baldersby, which are both in the Harrogate district, have also been removed from the register.
Read more:
- Harrogate and Knaresborough to have fewer voters under new plans
- Harrogate rough sleepers are being offered support, says council leader
Harrogate’s Plumpton Rocks saved from ‘at-risk’ register
A site in Harrogate painted by JMW Turner has been removed from the Heritage at Risk Register after long-term renovation.
Today, Historic England has published its annual Heritage at Risk Register. Plumpton Rocks is one of 17 in Yorkshire to have been removed from the list.
Considered one of the finest 18th century landscapes in the North of England, it was twice painted by JMW Turner.
It has been closed to the public for several years but is due to reopen in 2022.
The register is the yearly health-check of England’s most valued historic places and those most at risk of being lost forever.
Plumpton Rocks is a Grade II* listed landscape designed in the mid-18th century. Local residents will recognise it for its large rock formations and man-made dam.
Over the years the site has declined, mainly due to the silting of the lake and overgrowing trees.
However, funding from numerous grants and the owner totalling more than £400,000 has allowed landscapers to restore the site to its former glory. The lake has been dredged, repairs have been made to the dam and work to manage the trees.
The site is now set to reopen in spring 2022 after closing for repairs in October 2019.
In future, it is hoped public access to the site can be improved and the local angling club have already volunteered to tackle invasive vegetation.
Trevor Mitchell, regional director for the North East and Yorkshire at Historic England said:
“The 17 sites saved this year in Yorkshire show what’s possible with strong partnerships investing together to secure public benefits. Agencies such as Natural England, the National Lottery Heritage Fund and Historic England recognise the importance that historic places have for their local communities.
“It’s clear that restoring our heritage improves people’s lives.”
Over the past year Historic England has awarded £1.8 million in grants to historic places in Yorkshire, more than £800,000 of which came from the Government’s Culture Recovery Fund.
Read more:
- Wild swimmer says River Nidd pollution levels ‘concerning’
- Rich history of Ripon church opened to visitors
Harrogate district heritage sites ‘at risk’
The Heritage at Risk register highlights the plight of a further 15 historic buildings or places in the district:
- Church of St Mary, Harlow Terrace, Harrogate – very bad
- Temple of Victory in Flaxby – fair
- Orangery at Ripley Castle – poor
- Dob Park Lodge in Weston – poor
- Church of St James in Baldersby – fair
- Carved rocks on edge of Snowden Carr, Askwith – generally satisfactory
- Henge monument at Hutton Conyers – extensive significant problems
- Hutton Hall at Hutton Conyers – generally satisfactory
- Round barrow at Hutton Conyers – generally unsatisfactory with significant localised problems
- Medieval fishponds in Markington and Wallerthwaite – generally unsatisfactory with significant localised problems
- Howe Hill motte and Bailey Castle at North Deighton – generally unsatisfactory with significant localised problems
- Allerton Park at Allerton Castle – generally satisfactory
- Swinton Castle at Swinton – generally satisfactory
- Site of Battle of Boroughbridge – generally satisfactory