Good morning and welcome to the start of a new week and to our live updates on traffic and travel in the Harrogate district.
Whether you travel by car, bus or train we will keep an eye out for any possible disruption to your journey. All brought to you by The HACS Group.
It’s Connor again back on the travel desk from 6.30am. Spotted an accident or a road closure? Send your updates to contact@thestrayferret.co.uk.
If traffic is moving well or it’s at a standstill then we will let you know with our updates every 15 minutes.
Full update – 9am
Thanks for checking in with our traffic and travel live blog this morning. It’s been Connor keeping an eye out for any disruption and I will be back tomorrow morning from 6.30am.
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are starting to become busy today, particularly on Wetherby Road heading into Harrogate and from Ripley into Killinghall. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate. Delays of five minutes.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout. Delays of six minutes from Starbeck to Harrogate.
- High Street in Knaresborough.
- Old Barber area of Bilton. Major road repair scheme starts today.
Trains
- Services on the Harrogate to Leeds, Knaresborough and York routes look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.45am
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are starting to become busy today, particularly on Wetherby Road heading into Harrogate and from Ripley into Killinghall. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate. Delays of five minutes.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout. Delays of six minutes from Starbeck to Harrogate.
- High Street in Knaresborough.
- Old Barber area of Bilton. Major road repair scheme starts today.
Trains
- Services on the Harrogate to Knaresborough and York routes look to be on time this morning.
- The 8.05am Harrogate to Leeds service is now due at 8.41am.
- The 8.44am Harrogate to Knaresborough service is now due at 8.47am.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.30am
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are starting to become busy today, particularly on Wetherby Road heading into Harrogate and from Ripley into Killinghall. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate. Delays of five minutes.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Old Barber area of Bilton. Major road repair scheme starts today.
Trains
- Services on the Harrogate to Knaresborough and York routes look to be on time this morning.
- The 8.05am Harrogate to Leeds service is now due at 8.41am.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.15am
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are starting to become busy today. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate. Delays of five minutes.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Old Barber area of Bilton. Major road repair scheme starts today.
Trains
- Services on the Harrogate to Knaresborough and York routes look to be on time this morning.
- The 8.05am Harrogate to Leeds service is now due at 8.41am.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8am
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are starting to become busy today. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate. Delays of five minutes.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Old Barber area of Bilton. Major road repair scheme starts today.
Trains
- Services on the Harrogate to Knaresborough, York and Leeds routes look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.45am
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are starting to become busy today. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Old Barber area of Bilton. Major road repair scheme starts today.
Trains
- Services on the Harrogate to Knaresborough, York and Leeds routes look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.30am
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are starting to become busy today. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Old Barber area of Bilton. Major road repair scheme starts today.
Trains
- Services on the Harrogate to Knaresborough, York and Leeds routes look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.15am
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are looking clear so far today. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Old Barber area of Bilton. Major road repair scheme starts today.
Trains
- Services on the Harrogate to Knaresborough, York and Leeds routes look to be on time this morning.
- The 7.23am Harrogate to Leeds service is currently running two minutes late.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7am
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are looking clear so far today. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Old Barber area of Bilton. Major road repair scheme starts today.
Trains
- Services on the Harrogate to Knaresborough, York and Leeds routes look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 6.45am
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are looking clear so far today. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Old Barber area of Bilton. Major road repair scheme starts today.
Trains
- Services on the Harrogate to Knaresborough and Leeds routes look to be on time this morning.
- The 6.42am service from Harrogate to York is currently running seven minutes late.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 6.30am
Roads
- Fog is making travel difficult in the Harrogate district this morning. The Met Office has a yellow warning for fog until 10.30am.
- The roads are looking clear so far today. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- Services on the Harrogate to Knaresborough and Leeds routes look to be on time this morning.
- The 6.42am service from Harrogate to York is currently running six minutes late.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Live: Harrogate district traffic and travel
Good morning, it’s almost the weekend. It’s Suzannah here for the last time this week with your 15 minute road and rail line updates.
These morning blogs are designed to keep the Harrogate district moving. If traffic is moving well or it’s at a standstill then I will let you know.
The gritters were out overnight so take care on the roads.
Send me any updates via contact@thestrayferret.co.uk or leave a comment on our new travel Facebook page, ‘Harrogate district traffic and travel’.
Stay tuned for updates until 9am this morning. Have a great day.
Full Update – 9am
That’s it from me this morning, thanks for getting involved with the blog this week. Please keep me updated with anything going on near you.
My colleague Connor will be on the travel desk next week. He’ll be back bright and early 6.30am on Monday.
Roads
- Delays on Harrogate Road into Knaresborough, near the golf club, are increasing from seven minutes.
- Traffic is continuing to build around these construction works:
- Skipton Road, Harrogate – traffic is particularly slow here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout
- High Street in Knaresborough
- As more drivers come onto the roads, traffic is building in these areas:
- Otley Road, Harrogate, near Manor Drive
- Leeds Road, Harrogate
- Harewood – works are expected to finish here today
- Otley Road heading into Killinghall
- Front Street, Aldborough, near Boroughbridge
- Minskip Road, Boroughbridge, near Morrisons
Trains
- All services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.45am
Roads
- Slow traffic on the A59 Bond End, near Conyngham Hall Knaresborough
- Delays of around nine minutes are expected along Knaresborough Road and onto Starbeck high street
- Traffic is continuing to build around these construction works:
- Skipton Road, Harrogate – traffic is particularly slow here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout
- High Street in Knaresborough
- Elsewhere, it is getting busier here:
- Otley Road, Harrogate, near Manor Drive
- Ripon Road, Harrogate, near the Royal Hall
- North Road, Ripon
- Front Street, Aldborough, near Boroughbridge
Trains
- All services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.30am
Roads
- Traffic is continuing to build around these construction works:
- Skipton Road, Harrogate – traffic is particularly slow here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – traffic is leading onto Starbeck high street
- High Street in Knaresborough
- As more drivers come onto the roads, traffic is building in these areas:
- Ripon Road near Jennyfield and heading north to Ripley
- Otley Road, Harrogate, near Manor Drive
- Otley Road heading towards Killinghall
- Palace Road and Low Skellgate in Ripon
- Harrogate Road, Knaresborough, near Henshaws
Trains
- All services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.15am
Roads
- Traffic is continuing to build around these construction works:
- Skipton Road, Harrogate – traffic is particularly heavy here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – traffic is leading onto Starbeck high street
- High Street in Knaresborough
- Elsewhere, it is getting busier here:
- Wetherby Road and Hookstone Drive
- Otley Road, Harrogate, near Manor Drive
- Pannal
- Harewood – works are due to be completed here today
- Ripon Road heading into Ripley
- Ripon bypass
- Palace Road and St Mary’s Gate, Ripon
- York Road, Knaresborough, near Swallowtail Way
Trains
- All services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8am
Roads
- Traffic is building around these constructions works this morning:
- Skipton Road, Harrogate – traffic is particularly heavy here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – traffic is leading onto Starbeck high street
- High Street in Knaresborough
- Elsewhere in the district, there is slow moving traffic in these areas:
- Ripon Road near Jennyfield
- Otley Road, Harrogate, near Manor Drive
- B6265, Ripon, from the roundabout and over the River Ure
- Harrogate Road, Knaresborough, near Henshaws
Trains
- All services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.45am
Roads
- Construction works in these areas are slowing traffic this morning:
- Skipton Road, Harrogate – traffic is particularly heavy here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – traffic is leading onto Starbeck high street
- High Street in Knaresborough
- As more drivers come onto the roads, traffic is building in these areas:
- Pannal
- Exits off the Whinney Lane roundabout
- Ripon Road near Jennyfield
- Otley Road heading into Killinghall
Trains
- All services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.30am
Roads
- Construction works in these areas are slowing traffic this morning:
- Skipton Road, Harrogate – traffic is particularly heavy here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – traffic is leading onto Starbeck high street
- High Street in Knaresborough
- Elsewhere in the district, traffic is building here:
- Lancaster Park Road, off Knaresborough Road
- Exits off the Whinney Lane roundabout
- Harewood
- Boroughbridge Road, near Scriven
- Minskip Road, Boroughbridge, near Morrisons
Trains
- All services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.15am
Roads
- Construction works in these areas are slowing traffic this morning:
- Skipton Road, Harrogate – traffic is particularly heavy here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – traffic is leading onto Starbeck high street
- High Street in Knaresborough
- Traffic is beginning to build in these areas too:
- Exits off the Whinney Lane roundabout
- Otley Road leading into Killinghall
- Low Skellgate, Ripon
- York Road, Knaresborough near Hay-a-Park Lane
Trains
- All services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7am
Roads
- Construction works in these areas are slowing traffic this morning:
- Skipton Road, Harrogate
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout
- High Street in Knaresborough
- Elsewhere in the district, traffic is building here:
- Exits off the Whinney Lane roundabout
- Leeds Road, Harrogate
- Harewood
- Wetherby Road
Trains
- All services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 6.45am
Roads
- Traffic is beginning to build in these areas:
- Leeds Road, Harrogate
- Ripon Road near Jennyfield
- Otley Road, towards the turning for Cold Bath Road
- Wetherby Road
- Skipton Road, near Kex Gill
- Aldborough Gate, Boroughbridge
- Harrogate Road, Knaresborough, near Henshaws
- Construction works in these areas are also slowing traffic:
- Skipton Road, Harrogate
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout
- High Street in Knaresborough
Trains
- Services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 6.30am
- The gritters were out overnight so take care on the roads.
Roads
- Four sets of constructions works are continuing this morning, they are likely to cause delays, these include:
- Skipton Road, Harrogate
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout
- High Street in Knaresborough
- Elsewhere in the district, traffic looks to be moving well.
Trains
- Services on the Harrogate to York and Leeds routes look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Live: Traffic and travel updates in the Harrogate district
Good morning and happy Thursday, we’ve nearly made it to the end of the week. If you’re up early with me keep an eye on this blog for updates every 15 minutes on how the roads and rail lines are looking.
It’s Suzannah on the travel desk this morning, so send me any updates via contact@thestrayferret.co.uk.
Also, make sure you’re following our ‘Harrogate district traffic and travel’ Facebook group for updates.
If traffic is moving well or it’s at a standstill then I will let you know. Stay tuned until 9am this morning for your morning updates and have a lovely day.
Full Update – 9am
This is it from me today, I’m heading back over to the news desk. I’ll be back again tomorrow morning from 6.30am.
See you then, have a great day.
Roads
- Construction works are continuing to cause traffic this morning:
- Skipton Road, Harrogate – traffic is particularly heavy here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – leading onto Starbeck high street
- High Street in Knaresborough
- Traffic is also heavy in these areas:
- Yew Tree Lane, near Ashville College
- Leeds Road, Harrogate
- Pannal
- Harewood
- Ripon Road, around Jennyfield and further north in Ripley
- Palace Road and North Street in Ripon
- Leeds Road, Harrogate
Trains
- The 9.07 service from Harrogate to York will also only have two coaches this morning, instead of three.
- Other services on the Harrogate to York and Harrogate to Leeds lines look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.45am
- 11 minute delays are being reported along A59 near to Harrogate gold club.
- Construction works are continuing to cause traffic this morning:
- Skipton Road, Harrogate – traffic is particularly heavy here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – leading onto Starbeck high street
- High Street in Knaresborough – two minute delays here
- Elsewhere in the district, traffic is building here:
- Pannal
- Harewood
- Ripon Road, around Jennyfield
- Otley Road heading into Killinghall
- Palace Road near Ripon
- Wetherby Road, Boroughbridge, near the high school
- York Road in Knaresborough, near to Swallowtail Way
Trains
- The 9.07 service from Harrogate to York will also only have two coaches this morning.
- Other services on the Harrogate to York and Harrogate to Leeds lines look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.30am
Roads
- Construction works are continuing to cause traffic this morning:
- Skipton Road, Harrogate – traffic is particularly heavy here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – leading onto Starbeck high street
- High Street in Knaresborough.
- Traffic is also building here:
- Leeds Road, Harrogate
- Ripon Road, around Jennyfield and further north to Ripley
- Wormald Green, along Ripon Road
- Otley Road heading into Killinghall
- York Road in Knaresborough, near to Swallowtail Way
- Bondgate and Studley Road in Harrogate
Trains
- The 9.07 service from Harrogate to York will also only have two coaches this morning.
- Other services on the Harrogate to York and Harrogate to Leeds lines look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.15am
Roads
- Severe delays are being reported on Wetherby Road, between Mill Road and Spofforth Lane. Could be up to 30 minutes.
- Construction works are continuing to cause traffic this morning:
- Skipton Road, Harrogate – traffic is particularly heavy here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – leading onto Starbeck high street
- High Street in Knaresborough.
- Elsewhere in the district, traffic is building here:
- Leeds Road, Harrogate
- Ripon Road, around Jennyfield and further north to Ripley
- Otley Road, near Cold Bath Road, in Harrogate
- Pannal
- York Road in Knaresborough, near to Swallowtail Way
- Palace Road, Ripon
Trains
- The 9.07 service from Harrogate to York will also only have two coaches this morning.
- Other services on the Harrogate to York and Harrogate to Leeds lines look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8am
Roads
- Heavy traffic is being reported along Skipton Road due to the construction works.
- As more drivers join the daily commute, traffic is building in these areas too:
- Leeds Road, Harrogate
- Wetherby Road
- Ripon Road, around Jennyfield and further north to Ripley
- Yew Tree Lane, near Ashville College
- Pannal
- Harewood
- Other construction works are increasing traffic as well, these are:
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – leading onto Starbeck high street
- High Street in Knaresborough.
Trains
- The 9.07 service from Harrogate to York will also only have two coaches this morning.
- Other services on the Harrogate to York and Harrogate to Leeds lines look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.45am
Roads
- Heavy traffic is being reported along Skipton Road near the construction works.
- Other works are increasing traffic as well, these are:
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – leading onto Starbeck high street
- High Street in Knaresborough.
- Elsewhere in the district, traffic is building here:
- Kings Road, Harrogate
- Leeds Road, Harrogate
- Harewood
- A658 heading onto the roundabout for Pannal
- Ripon Road, around Jennyfield and further north to Ripley
- Morrisons roundabout in Ripon
- Low Skellgate, Ripon
- York Road, Boroughbridge, around the primary school
Trains
- The 9.07 service from Harrogate to York will also only have two coaches this morning.
- Other services on the Harrogate to York and Harrogate to Leeds lines look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.30am
Roads
- Traffic is beginning to build in a number of areas, including:
- Harewood – construction works here are ongoing
- A658 heading onto the roundabout for Pannal
- Ripon Road, around Jennyfield
- Otley Road heading into Killinghall
- Construction works are increasing traffic around some areas including:
- Skipton Road, Harrogate – traffic is building here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – leading onto Starbeck high street
- High Street in Knaresborough.
Trains
- The 7.23 service from Harrogate to Leeds will only have two coaches this morning instead of three.
- The 9.07 service from Harrogate to York will also only have two coaches this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.15am
Roads
- Construction works are increasing traffic around some areas including:
- Skipton Road, Harrogate – traffic is building here
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – leading onto Starbeck high street
- High Street in Knaresborough.
- Elsewhere in the district, traffic is slowing here:
- Junction at the bottom of Parliament Street, Harrogate
- Otley Road heading into Killinghall
- A61 around Pannal
- Harewood – construction works here are ongoing
- Palace Road, Ripon
- York Road in Knaresborough, near to Swallowtail Way
Trains
- The 7.23 service from Harrogate to Leeds will only have two coaches this morning instead of three.
- Other services on the Harrogate to York and Harrogate to Leeds lines, including Knaresborough, look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7am
Roads
- Construction works are increasing traffic around some areas including:
- Skipton Road, Harrogate
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout – leading onto Starbeck high street
- High Street in Knaresborough.
- Traffic is also increasing in these areas:
- Ripon Road, around Jennyfield and further north to Ripley
- Otley Road heading into Killinghall
- Low Skellgate, Ripon
Trains
- The 7.23 service from Harrogate to Leeds will only have two coaches this morning instead of three.
- Other services Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 6.45am
Roads
- Construction works are increasing traffic around some areas including:
- Skipton Road, Harrogate
- Woodlands Junction, Wetherby Road
- Knaresborough Road, near to the Empress Roundabout
- High Street in Knaresborough.
- Elsewhere in the district, the roads look to be clear looks so far.
Trains
- The 7.23 service from Harrogate to Leeds will only have two coaches this morning instead of three.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 6.30am
Roads
- Construction works at Woodlands Junction are already causing delays this morning. Temporary traffic lights are in place.
- Works are ongoing on Skipton Road, Knaresborough Road – near the Empress roundabout – and Knaresborough High Street. These are likely to cause delays.
- Elsewhere in the district, traffic looks to be moving well so far.
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Live: Traffic and travel in the Harrogate district
Good morning, it’s Suzannah here with you again this morning. I’ll be keeping you up to date, every 15 minutes, on how the roads and rail lines are looking this morning.
I’ll be here from 6.30am to 9am, if traffic is moving well or it’s at a standstill then I will let you know.
Let me know what’s going on near you via contact@thestrayferret.co.uk. Also, make sure you’re following our ‘Harrogate district traffic and travel’ Facebook group for updates.
Thank you for keeping an eye on the blog, I hope you have a great day.
Full Update – 9am
Thank you for your help this morning, I’m jumping back over to the news desk for the rest of the day.
I’ll be back tomorrow morning at 6.30am, have a great day.
Roads
- Constructions works are increasing traffic around some areas including:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout – traffic is slow onto Starbeck high street
- High Street in Knaresborough.
- Elsewhere in the district, traffic is slowing here:
- Leeds Road, Harrogate
- Ripon Road, around Jennyfield
- Otley Road heading into Killinghall
- Wetherby Road, particularly around Woodlands Junction
- Green Lane, near Ashville College
- Harewood
- Ripon city centre – North Street, Palace Road and Studley Road
- York Road in Knaresborough, near to Swallowtail Way
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.45am
Roads
- Slow traffic is being reported along Skipton Road in Harrogate due to constructions works.
- Constructions works, elsewhere, on Knaresborough Road and Knaresborough High Street are also causing delays.
- With more drivers coming onto the roads, traffic is also building in these areas:
- Leeds Road Harrogate
- Wetherby Road, particularly around Woodlands Junction
- Otley Road heading into Killinghall
- Green Lane, near Ashville College
- A61 around Pannal
- Palace Road, Ripon
- A6055 through Minskip
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.30am
Roads
- Constructions works are increasing traffic around some areas including:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout – traffic is slow onto Starbeck high street
- High Street in Knaresborough.
- Elsewhere in the district, traffic is slowing here:
- Leeds Road, Harrogate
- Woodlands Junction, Wetherby Road
- Ripon Road, around Jennyfield
- Otley Road heading into Killinghall
- Palace Road, Ripon
- A61 around Pannal
- Harewood, construction works are ongoing
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.15am
Roads
- With more drivers coming onto the roads, traffic is building in the following areas:
- Harewood
- A658 towards to roundabout for Pannal
- Wetherby Road
- Ripon Road around Jennyfield Drive
- Otley Road heading into Killinghall
- Palace Road, Ripon
- York Road in Knaresborough, near to Swallowtail Way
- Constructions works are increasing traffic around some areas including:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout – traffic is slow onto Starbeck high street
- High Street in Knaresborough.
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8am
Roads
- Slow traffic is being caused by some construction works this morning including:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout – traffic is slow onto Starbeck high street
- High Street in Knaresborough.
- Other areas of the district are seeing traffic as well, these include:
- Harewood, construction works are ongoing
- A59 around Blubberhouses
- Palace Road, Ripon
- High Bridge in Knaresborough, near Henshaws
- Leeds Road, Harrogate
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.45am
Roads
- Constructions works around Skipton Road, Harrogate are causing five minute delays
- Works on Knaresborough High Street are causing two minute delays
- Other works along Knaresborough Road, near to the Empress Roundabout are also slowing traffic.
- Elsewhere in the district traffic is slowing here:
- Burn Bridge Road
- Harewood, construction works are ongoing
- Along the A658 heading towards the roundabout for Pannal
- Ripon Road, near Jennyfield Drive
- Palace Road, Ripon
Trains
- Despite previous delays, the rest of this morning’s services on the Harrogate to York line, including Knaresborough, look to be on time.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.30am
Roads
- Constructions works are increasing traffic around some areas including:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout – traffic is slow onto Starbeck high street
- High Street in Knaresborough.
- Elsewhere in the district traffic is slowing here:
- Wetherby Road
- York Road, Knaresborough
- Harewood
- North Road and Palace Road, Ripon
- Otley Road heading into Killinghall
Trains
- Despite previous delays, the rest of this morning’s services on the Harrogate to York line, including Knaresborough, look to be on time.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.15am
Roads
- Construction works are causing slow moving traffic again this morning around:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Other areas of the district are seeing traffic as well, these include:
- Wetherby Road
- A59 around Blubberhouses
- Palace Road and Bondgate, Ripon
Trains
- The 6.42 service from Harrogate to York is delayed by 18 minutes. It will arrive in York at 7.32.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7am
Roads
- Traffic is beginning to build in a number of areas around the district including:
- Ripon Road, near Jennyfield Drive
- Woodlands Junction, along Wetherby Road in Harrogate
- Harewood, construction works are ongoing
- Construction works are causing slow moving traffic again this morning around:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- The 6.42 service from Harrogate to York has been delayed by 18 minutes due to engineering works not being complete. It is due to leave Harrogate at 7am.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 6.45am
Roads
- Construction works are causing slow moving traffic again this morning around:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Traffic also looks to be building elsewhere:
- Woodlands Junction, along Wetherby Road in Harrogate
- Ripon Road, near Jennyfield Drive
- Thorpe Road heading into Masham
- York Road in Knaresborough, near to Swallowtail Way
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 6.30am
Roads
- Traffic is looking clear so far this morning.
- Be aware of continuing roadworks that are likely to cause delays as more drivers come onto the road. These areas are:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Live: Harrogate district traffic and travel
Good morning and happy Tuesday, I’m back with another morning of 15 minutes updates on how the roads and transport links near you are looking.
Keep an eye on this blog to keep up to date. It’s Suzannah on the travel desk this morning, so send me any updates via contact@thestrayferret.co.uk.
The gritters were out overnight with some road surfaces said to have dropped to zero degrees. Take care this morning.
I’ll be keeping you up to date with roads and rail lines this morning with 15 minute updates. If traffic is moving well or it’s at a standstill then I will let you know.
These morning blogs are designed to keep the Harrogate district moving.
Full Update – 9am
Thank you for getting involved in the blog this morning, I’m jumping back over to the news desk for the rest of the day.
Please get in touch with any updates as you see them. I’ll be keeping an eye out on the roads and rail lines too.
Roads
- Construction works are slowing traffic this morning with delays increasing around:
- Skipton Road, Harrogate – traffic here, particularly, is slowing down
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Traffic is also being reported in these areas:
- Wetherby Road
- A6055 Boroughbridge Road, north of Knaresborough, temporary lights are in operation
- A61 around Pannal
- Harewood
- Ripon Road, near the Royal Hall and up towards Jennyfield Drive
- Otley Road heading into Killinghall
- Low Skellgate and Water Skellgate in Ripon
- Along York Road in Knaresborough
Trains
- Due to a fault on the train, the 9.07 service from Harrogate has been delayed until 9.21.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.45am
- Gritters were out overnight with some road surfaces said to have dropped to zero degrees, take care.
Roads
- Traffic is continuing to build in areas across the district, including:
- A6055 Boroughbridge Road, north of Knaresborough, temporary lights are in operation
- Wetherby Road
- Leeds Road, Harrogate
- Otley Road, near Harlow Carr
- Harewood – temporary lights are expected to stay in place until the end of the week
- A61 around Pannal
- Construction works are slowing traffic this morning with delays increasing, these areas include:
- Skipton Road, Harrogate – traffic here, particularly, is slowing down
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- The 9.07 service from Harrogate has been delayed, no rescheduled time has been given.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.30am
- Gritters were out overnight with some road surfaces said to have dropped to zero degrees, take care.
Roads
- Construction works are slowing traffic this morning with delays increasing, these areas include:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Elsewhere in the district traffic is building around these areas:
- Ripon Road, near Jennyfield Drive
- Wetherby Road
- A61 around Pannal
- Harewood – temporary lights are expected to stay in place until the end of the week
- Ripon Road heading into Ripley
- Low Skellgate and Water Skellgate in Ripon
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.15am
- Gritters were out overnight with some road surfaces said to have dropped to zero degrees, take care.
Roads
- Traffic is building in a number of areas, these include:
- A6055 Boroughbridge Road – temporary lights are in operation
- York Road near to Swallowtail Way in Knaresborough
- Wetherby Road
- Leeds Road, Harrogate
- Harewood
- Ripon Road, near Jennyfield Drive
- Otley Road heading into Killinghall
- Construction works are also slowing traffic this morning, these include:
- Skipton Road, Harrogate – traffic here, particularly, is slowing down
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8am
- Gritters were out overnight with some road surfaces said to have dropped to zero degrees, take care.
Roads
- Construction works are slowing traffic this morning, these include:
- Skipton Road, Harrogate – traffic here, particularly, is slowing down
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- With more commuters coming onto the roads, traffic is building in other areas. These include:
- Wetherby Road, Harrogate
- Ripon Road, near the Royal Hall
- Leeds Road, Harrogate
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.45am
- Gritters were out overnight with some road surfaces said to have dropped to zero degrees, take care.
Roads
- Construction works are slowing traffic this morning, these include:
- Skipton Road, Harrogate – traffic here, particularly, is slowing down
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Elsewhere in the district traffic is building around these areas:
- Leeds Road, Harrogate
- Harewood
- Otley Road heading into Killinghall
- Water Skellgate in Ripon
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.30am
- Gritters were out overnight with some road surfaces said to have dropped to zero degrees, take care.
Roads
- Traffic is beginning to build in a number of areas as drivers join the daily commute. These include:
- Parliament Street and Crescent Road corner, Harrogate
- Along the A61 heading into Pannal
- Harewood
- North Road and Palace Road in Ripon
- Wetherby Road, Harrogate
- Construction works are also slowing traffic this morning, these include:
- Skipton Road, Harrogate – traffic here, particularly, is slowing down
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.15am
- Gritters were out overnight with some road surfaces said to have dropped to zero degrees, take care.
Roads
- Traffic is beginning to build in a number of areas as drivers join the daily commute. These include:
- Ripon Road, near the Royal Hall
- Leeds Road, Harrogate
- A658 towards the roundabout into Pannal
- Harewood
- Starbeck High Street
- Construction works are also slowing traffic this morning, these include:
- Skipton Road, Harrogate – traffic here, particularly, is slowing down
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7am
- Gritters were out overnight with some road surfaces said to have dropped to zero degrees, take care.
Roads
- Traffic is building on the A658 towards the roundabout into Pannal and roads around Killinghall.
- In Knaresborough, traffic looks to be building along York Road near to Swallowtail Way.
- Continuing construction works are likely to cause delays again today, these include:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 6.45am
- Gritters were out overnight with some road surfaces said to have dropped to zero degrees, take care.
Roads
- A number of construction works are already causing delays this morning, these include:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Temporary traffic lights are causing traffic to build up in Harewood as well. These works are expected to be in place until the end of the week.
- Traffic is building on the A658 towards the roundabout into Pannal and Otley Road, close to Killinghall.
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 6.30am
- Gritters were out overnight with some road surfaces said to have dropped to zero degrees, take care.
Roads
- The roads are looking clear this morning, except for congestion caused by construction works around Harrogate’s town centre.
- Continuing construction works are likely to cause delays again today, these include:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- Services on the Harrogate to York line, including Knaresborough, look to be on time this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Live: Traffic and travel updates in the Harrogate district
Good morning everyone we have another week of live traffic and travel updates, from 6.30am to 9am, designed to keep the Harrogate district moving.
It’s Suzannah on the travel desk this morning, so send me any updates via contact@thestrayferret.co.uk. Also, make sure you’re following our ‘Harrogate district traffic and travel’ Facebook group for updates.
I’ll be keeping you up to date with roads and rail lines this morning with 15 minute updates. If traffic is moving well or it’s at a standstill then I will let you know.
Thank you for keeping an eye on the blog, stay tuned until 9am this morning for your morning updates. Have a lovely day.
Full Update – 9am
Thank you for sticking with me this morning, I’m moving back over to the news desk now. Make sure to get in touch if there are any travel developments near you. I’ll be here again tomorrow morning.
Roads
- There are reports of heavy traffic along Ripon Road with tailbacks to New Park roundabout.
- Delays of up to eight minutes are reported along Skipton and Knaresborough Road as constructions works continue to slow down traffic.
- Constructions works around Knaresborough High Street are also causing delays.
- Delays are continuing around the Harrogate district as many drivers come to the end of their commute this morning. Areas affected include:
- Leeds Road, Harrogate
- Wetherby Road
- Ripley, along Ripon Road
- A lane has reopened on the A1 (M) between Junction 50 and 51 near Ripon. All lanes are now open.
Trains
- Harrogate to York and Knaresborough services are on time.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.45am
Roads
- There is heavy traffic around construction works on Skipton Road, this traffic is is spreading on to Knaresborough Road and Starbeck.
- Construction works are also causing delays around Knaresborough High Street.
- Traffic is beginning to build around the Harrogate district as drivers join the daily commute including:
- Leeds Road, Harrogate
- Wetherby Road
- Harewood, along the A61 – temporary lights are causing heavy traffic in the area.
- B6165 heading into Summerbridge
- A lane has reopened on the A1 (M) between Junction 50 and 51 near Ripon. All lanes are now open.
Trains
- Harrogate to York and Knaresborough services are on time.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.30am
Roads
- Traffic is beginning to build around the Harrogate district as more drivers join the daily commute including:
- Leeds Road, Harrogate
- Wetherby Road
- Otley Road heading into Killinghall
- Ripon Road, near Jennyfield Drive
- Harewood, along the A61 – temporary lights are causing heavy traffic in the area.
- A658, Harrogate Road
- There are a number of construction sites also slowing traffic down this morning:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- One lane remains closed on the A1 (M) southbound between J51, Bedale, and J50, Ripon. This is due to a lorry having a tire changed. Traffic is reported to be coping well.
Trains
- The 7.52 service from Harrogate to York was delayed by a couple of minutes this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8.15am
- There are a number of construction sites beginning to slow down traffic this morning:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- Traffic is beginning to build around the Harrogate district as more drivers join the daily commute including:
- Leeds Road, Harrogate
- Wetherby Road
- Otley Road heading into Killinghall
- Harewood, along the A61 – temporary lights are causing heavy traffic in the area.
- One lane remains closed on the A1 (M) southbound between J51, Bedale, and J50, Ripon. This is due to a lorry having a tire changed. Traffic is reported to be coping well.
Trains
- The 7.52 service from Harrogate to York was delayed by a couple of minutes this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 8am
Roads
- Traffic is beginning to build around the Harrogate district as more drivers join the daily commute including:
- Leeds Road, Harrogate
- Wetherby Road
- Otley Road heading into Killinghall
- Harewood, along the A61 – temporary lights are causing heavy traffic in the area.
- A658, Harrogate Road
- Traffic is also building around a number of continuing construction sites including:
- Skipton Road is moving slowly this morning due to the four-way traffic lights.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- One lane remains closed on the A1 (M) southbound between J51, Bedale, and J50, Ripon. This is due to a lorry having a tire changed. Traffic is reported to be coping well.
Trains
- The 7.52 service from Harrogate to York was delayed by a couple of minutes this morning.
Buses
- Buses appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.45am
Roads
- Traffic is building in a number of areas around the Harrogate district:
- Harewood, along the A61 – temporary lights are causing heavy traffic in the area.
- Leeds Road, Harrogate
- York Place, Harrogate
- Traffic is also building around a number of continuing construction sites including:
- Skipton Road is moving slowly this morning due to the four-way traffic lights.
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- One lane remains closed on the A1 (M) southbound between J51, Bedale, and J50, Ripon. This is due to a lorry having a tire changed. Traffic is reported to be coping well.
Trains
- Harrogate to York and Knaresborough services are on time.
- A number of services on the Leeds to Bradford route, both ways, are delayed this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.30am
Roads
- Four-way lights on Skipton Road, in the construction area, are causing delays and traffic this morning.
- Traffic is building in a number of areas around the Harrogate district:
- Otley Road heading into Killinghall
- Starbeck high street, both ways, is slow moving this morning.
- Low Moor Lane, north of Knaresborough.
- Traffic is also building around a number of continuing construction sites including:
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- One lane is still closed on the A1 (M) southbound between J51, Bedale, and J50, Ripon. This is due to a lorry having a tire changed. Traffic is reported to be coping well.
Trains
- Harrogate to York and Knaresborough services are on time.
- A number of services on the Leeds to Bradford route, both ways, are delayed this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7.15am
Roads
- Traffic looks to be building along around Jennyfield Drive and further north in Ripley.
- Elsewhere in the district, traffic is building around a number of construction sites including:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
- One lane is still closed on the A1 (M) southbound between J51, Bedale, and J50, Ripon. This is due to a lorry having a tire changed. Traffic is reported to be coping well.
Trains
- The 6.42 train from Harrogate to York was delayed by a couple of minutes this morning. It looks like it will arrive in York at 7.21.
- A number of services on the Leeds to Bradford route, both ways, are delayed this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 7am
Roads
- One lane is still closed on the A1 (M) southbound between J51, Bedale, and J50, Ripon. This is due to a lorry having a tire changed. Traffic is reported to be coping well.
- Traffic looks to be building along Starbeck high street heading into Harrogate town centre and along Ripon Road near Jennyfield Drive.
- There are a number of construction sites beginning to slow down traffic this morning:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- The 6.42 train from Harrogate to York was delayed by a couple of minutes this morning.
- A number of services on the Leeds to Bradford route, both ways, are delayed this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 6.45am
Roads
- One lane is closed on the A1 (M) southbound between J51, Bedale, and J50, Ripon. This is due to a lorry having a tire changed. Traffic is reported to be coping well.
- There are some construction sites likely to cause delays this morning:
- Skipton Road, Harrogate
- Knaresborough Road, near to the Empress Roundabout.
- High Street in Knaresborough.
Trains
- A number of services on the Leeds to Bradford route, both ways, are delayed this morning.
- The 6.42 train from Harrogate to York is delayed by a couple of minutes this morning.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full Update – 6.30am
- The roads are looking clear this morning, except for congestion caused by construction works around Harrogate’s town centre.
- Watch out on Wetherby Road, traffic is building up there.
- There are construction works continuing on Knaresborough Road, near to the Empress Roundabout, Skipton Road near Kings Road and also Knaresborough High Street. Those works are likely to cause delays.
- The trains are running well this morning. There are currently no cancellations that we can see for the Harrogate district.
Live: Harrogate district traffic and travel
Good morning and happy Friday. Welcome back to our traffic and travel service to help the Harrogate district keep moving.
Whether you travel by car, bus or train we will keep an eye out for any possible disruption to your journey.
It’s Connor again back on the travel desk from 6.30am. Spotted an accident or a road closure? Send your updates to contact@thestrayferret.co.uk.
If traffic is moving well or it’s at a standstill then we will let you know with our updates every 15 minutes.
Full update – 9am
Thanks again for your interest in the traffic and travel live blog. My colleague Suzannah will pick it up first thing on Monday morning so come back at 6.30am then.
Roads
- There is heavy traffic on the A59 from Clockhill Field Lane to Station Road, near the construction area. Delays of up to 30 minutes.
- Traffic is becoming heavy around the following construction sites:
- Skipton Road, Harrogate. Delays of four minutes.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- The 7 bus cannot reach Boston Spa near Wetherby due to an emergency road closure.
Full update – 8.45am
Roads
- There is heavy traffic on the A59 from Clockhill Field Lane to Station Road, near the construction area. Delays of up to 30 minutes.
- Traffic is becoming heavy around the following construction sites:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- The 7 bus cannot reach Boston Spa near Wetherby due to an emergency road closure.
Full update – 8.30am
Roads
- Traffic is becoming heavy around the following construction sites:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- The 7 bus cannot reach Boston Spa near Wetherby due to an emergency road closure.
Full update – 8.15am
Roads
- Traffic is becoming heavy around the following construction sites:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- The 7 bus cannot reach Boston Spa near Wetherby due to an emergency road closure.
Full update – 8am
Roads
- Traffic is becoming heavy around the following construction sites:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The 7.23am Harrogate to Leeds service now expected at 7.58am.
- The 9.07am Harrogate to York is expected to arrive at 9.14am.
- Harrogate to Knaresborough services are on time.
Buses
- The 7 bus cannot reach Boston Spa near Wetherby due to an emergency road closure.
Full update – 7.45am
Roads
- Traffic is becoming heavy around the following construction sites:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The 7.23am Harrogate to Leeds service now expected at 7.57am.
Harrogate to York and Knaresborough services are on time.
Buses
- The 7 bus cannot reach Boston Spa near Wetherby due to an emergency road closure.
https://twitter.com/harrogatebus/status/1362667270812631042
Full update – 7.30am
Roads
- Traffic is becoming heavy around the following construction sites:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The 7.23am Harrogate to Leeds service now expected at 7.40am.
- Harrogate to York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.15am
Roads
- Traffic is starting to build up around the following construction sites:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The 7.23am Harrogate to Leeds service has been delayed to 7.38am.
- Harrogate to York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7am
Roads
- Traffic is starting to build up around the following construction sites:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The 7.23am Harrogate to Leeds service has been delayed to 7.38am and increasing.
- Harrogate to York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 6.45am
Roads
- The roads are looking clear so far today.. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The 7.23am Harrogate to Leeds service has been delayed to 7.38am and increasing.
- Harrogate to York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 6.30am
Roads
- The roads are looking clear so far today.. There are some construction sites likely to cause delays:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The 7.23am Harrogate to Leeds service has been delayed without any clear plan on when or if it will arrive.
- Harrogate to York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Good morning and welcome once again to our traffic and travel service for the Harrogate district.
Whether you travel by car, bus or train we will keep an eye out for any possible disruption to your journey.
It’s Connor again back on the travel desk from 6.30am. Spotted an accident or a road closure? Send your updates to contact@thestrayferret.co.uk.
If traffic is moving well or it’s at a standstill then we will let you know with our updates every 15 minutes.
Full update – 9am
Thanks to everyone who has been getting involved in this traffic and travel blog. I am switching over to the news desk now but will be back from 6.30am tomorrow.
Roads
- Accident on A59 near Green Hammerton has now cleared.
- Beech Grove in Harrogate is now closed to through traffic as part of a cycle scheme.
- Traffic is building up on the roads this morning with much of the congestion around the following construction sites.
- Skipton Road, Harrogate. Delays of six minutes but now easing.
- Ripon Road, at the junction with Jennyfield Drive. Reports of drivers performing u-turns to avoid traffic.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.45am
Roads
- Accident on A59 near Green Hammerton has now cleared.
- Beech Grove in Harrogate is now closed to through traffic as part of a cycle scheme.
- Traffic is building up on the roads this morning with much of the congestion around the following construction sites.
- Skipton Road, Harrogate. Delays of six minutes but now easing.
- Ripon Road, at the junction with Jennyfield Drive. Reports of drivers performing u-turns to avoid traffic.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.30am
Roads
- Accident on A59 near Green Hammerton causing delays, with heavy traffic around Station Road.
- Beech Grove in Harrogate is now closed to through traffic as part of a cycle scheme.
- Traffic is building up on the roads this morning with much of the congestion around the following construction sites.
- Skipton Road, Harrogate. Delays of six minutes but now easing.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.15am
Roads
- Accident on A59 near Green Hammerton causing delays, with heavy traffic around Station Road.
- Beech Grove in Harrogate is now closed to through traffic as part of a cycle scheme.
- Traffic is building up on the roads this morning with much of the congestion around the following construction sites.
- Skipton Road, Harrogate. Delays of six minutes but now easing.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8am
Roads
- Accident on A59 near Green Hammerton causing delays, with heavy traffic around Station Road.
- Beech Grove in Harrogate is now closed to through traffic as part of a cycle scheme.
- Traffic is building up on the roads this morning with much of the congestion around the following construction sites.
- Skipton Road, Harrogate. Delays of six minutes but now easing.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.45am
Roads
- Beech Grove in Harrogate is now closed to through traffic as part of a cycle scheme.
- Traffic is building up on the roads this morning with much of the congestion around the following construction sites.
- Skipton Road, Harrogate. Delays of six minutes. Inrix reporting heavy traffic here.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.30am
Roads
- Beech Grove in Harrogate is now closed to through traffic as part of a cycle scheme.
- Traffic is building up on the roads this morning with much of the congestion around the following construction sites.
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.15am
Roads
- Beech Grove in Harrogate is closed to through traffic as part of a cycle scheme.
- Traffic is building up on the roads this morning with much of the congestion around the following construction sites.
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7am
Roads
- The roads appear clear so far today except for around construction sites, particularly in Harrogate:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are all expected on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 6.45am
Roads
- The roads appear clear so far today. There are some construction sites likely to cause delays, particularly in Harrogate:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 6.30am
Roads
- The roads are looking clear bright and early this morning. There are some construction sites likely to cause delays, particularly in Harrogate, but congestion has not yet built up in those areas:
- Skipton Road, Harrogate.
- Ripon Road, at the junction with Jennyfield Drive.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Good morning everyone and welcome back to our traffic and travel service for the Harrogate district.
Whether you travel by car, bus or train we will keep an eye out for any possible disruption to your journey.
It’s Connor again back on the travel desk from 6.30am. Spotted an accident or a road closure? Send your updates to contact@thestrayferret.co.uk.
If traffic is moving well or it’s at a standstill then we will let you know with our updates every 15 minutes.
Full update – 9am
Thanks to everyone who has been getting involved with this new traffic and travel service. Good to read that people are finding it helpful. I am moving over to the news desk now but will be back with renewed vigour tomorrow morning at 6.30am. Connor.
Roads
- The roads are starting to slow this morning as more cars get on the road. There are some construction sites likely to cause delays, particularly in Harrogate:
- New: Ripon Road at the junction with Jennyfield Drive works causing delays.
- Skipton Road, Harrogate. Delays of four minutes.
- Knaresborough Road, near to the Empress Roundabout. Delays of four minutes from Starbeck.
- Leeds Road, near to Crimple Hall and St George’s Roundabout.
- High Street in Knaresborough.
- New: Crash on the A59 at New Road on the way to York causing delays .
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time after the earlier cancellations.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.45am
Roads
- The roads are starting to slow this morning as more cars get on the road. There are some construction sites likely to cause delays, particularly in Harrogate:
- Skipton Road, Harrogate. Delays of four minutes.
- Knaresborough Road, near to the Empress Roundabout. Delays of four minutes from Starbeck.
- Leeds Road, near to Crimple Hall and St George’s Roundabout.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time after the earlier cancellations.
- The 8.09am Knaresborough to Leeds service which was delayed to 8.56am has been cancelled.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.30am
Roads
- The roads are starting to slow this morning as more cars get on the road. There are some construction sites likely to cause delays, particularly in Harrogate:
- Skipton Road, Harrogate. Delays of four minutes.
- Knaresborough Road, near to the Empress Roundabout. Delays of four minutes from Starbeck.
- Leeds Road, near to Crimple Hall and St George’s Roundabout.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time after the earlier cancellations.
- The 8.09am Knaresborough to Leeds service which was delayed to 8.56am has been cancelled.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.15am
Roads
- The roads are starting to slow this morning as more cars get on the road. There are some construction sites likely to cause delays, particularly in Harrogate, but congestion has not yet built up in those areas:
- Skipton Road, Harrogate. Delays of seven minutes.
- Knaresborough Road, near to the Empress Roundabout. Delays of four minutes from Starbeck.
- Leeds Road, near to Crimple Hall and St George’s Roundabout.
- High Street in Knaresborough.
Trains
- The 8.18am service Harrogate to Leeds is cancelled. Due to a broken down train earlier.
- All other services are expected on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8am
Roads
- The roads are starting to slow this morning as more cars get on the road. There are some construction sites likely to cause delays, particularly in Harrogate, but congestion has not yet built up in those areas:
- Skipton Road, Harrogate. Delays of seven minutes.
- Knaresborough Road, near to the Empress Roundabout. Delays of four minutes from Starbeck.
- Leeds Road, near to Crimple Hall and St George’s Roundabout.
- High Street in Knaresborough.
Trains
- The 8.18am service Harrogate to Leeds is cancelled. Due to a broken down train earlier.
- All other services are expected on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.45am
Roads
- The roads are starting to slow this morning as more cars get on the road. There are some construction sites likely to cause delays, particularly in Harrogate, but congestion has not yet built up in those areas:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and St George’s Roundabout.
- High Street in Knaresborough.
Trains
- The 7.41am service Harrogate to Knaresborough has now been cancelled. Due to a broken down train earlier.
- The 8.18am service Harrogate to Leeds has now been cancelled. Due to a broken down train earlier.
- All other services are expected on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.30am
Roads
- The roads are still looking fairly clear this morning. There are some construction sites likely to cause delays, particularly in Harrogate, but congestion has not yet built up in those areas:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout, near to St Mark’s Church.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations. Harrogate to York services are on time.
- The 7.41am service Harrogate to Knaresborough has now been cancelled. Due to a broken down train earlier.
- The 8.18am service Harrogate to Leeds has now been cancelled. Due to a broken down train earlier.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.15am
Roads
- The roads are still looking fairly clear this morning. There are some construction sites likely to cause delays, particularly in Harrogate, but congestion has not yet built up in those areas:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout, near to St Mark’s Church.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations. Harrogate to York services are on time.
- The 7.41am service Harrogate to Knaresborough is currently expected at 7.55am. Delays have been increasing since 6.30am.
- The 8.18am service Harrogate to Leeds is currently expected at 8.22am.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7am
Roads
- The roads are still looking clear this morning. There are some construction sites likely to cause delays, particularly in Harrogate, but congestion has not yet built up in those areas:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout, near to St Mark’s Church.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations. Harrogate to Leeds, York and Knaresborough services are on time.
- The 7.41am service Harrogate to Knaresborough is currently expected at 7.53am. Delays have been increasing since 6.30am.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 6.45am
Roads
- The roads are looking clear this morning. There are some construction sites likely to cause delays, particularly in Harrogate, but congestion has not yet built up in those areas:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout, near to St Mark’s Church.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations. Harrogate to Leeds, York and Knaresborough services are on time.
- The 7.41am service Harrogate to Knaresborough is currently expected at 7.43am.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 6.30am
Roads
- The roads are looking clear bright and early this morning. There are some construction sites likely to cause delays, particularly in Harrogate, but congestion has not yet built up in those areas:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout, near to St Mark’s Church.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds, York and Knaresborough services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Good morning everyone and thanks for getting involved in this new traffic and travel service for the Harrogate district.
It’s Connor again back on the travel desk from 6.30am. Spotted an accident or a road closure? Send your updates to contact@thestrayferret.co.uk.
We will keep across the roads and rail lines. If traffic is moving well or it’s at a standstill then we will let you know with our updates every 15 minutes.
Have a lovely day and keep on top of traffic and travel right here on the Stray Ferret.
Full update – 9am
Thanks for getting involved everyone. I am heading over to the news desk now but will be back again tomorrow morning.
Roads
Traffic is building around the following construction sites:
- Skipton Road, Harrogate. Causing delays of four minutes and increasing.
- Knaresborough Road, near to the Empress Roundabout and from Knaresborough. Delays of six minutes and increasing.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
- Harrogate Road at the junction with the A659, Harewood.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate’s services to Leeds are expected on time.
- The 9.07am Harrogate to York service is expected at 9.11am.
- The 9.37am Harrogate to Knaresborough service is expected at 9.45am.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.45am
Roads
Traffic is building around the following construction sites:
- Skipton Road, Harrogate. Causing delays of four minutes and increasing.
- Knaresborough Road, near to the Empress Roundabout and from Knaresborough. Delays of six minutes and increasing.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
- Harrogate Road at the junction with the A659, Harewood.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate’s services to Leeds are expected on time.
- The 9.07am Harrogate to York service is expected at 9.12am.
- The 9.37am Harrogate to Knaresborough service is expected at 9.45am.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.30am
Roads
Traffic is building around the following construction sites:
- Skipton Road, Harrogate. Causing delays of nine minutes and increasing.
- Knaresborough Road, near to the Empress Roundabout and from Knaresborough. Delays of six minutes and increasing.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
- Harrogate Road at the junction with the A659, Harewood.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate’s services to Leeds and York are expected on time.
- The 9.37am Harrogate to Knaresborough service is expected at 9.45am.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 8.15am
Roads
Traffic is building around the following construction sites:
- Skipton Road, Harrogate. Quite heavy in both directions.
- Knaresborough Road, near to the Empress Roundabout and from Knaresborough.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
- Harrogate Road at the junction with the A659, Harewood.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate’s services to Leeds, York and Knaresborough are all expected on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.

Full update – 8am
Roads
Traffic is building around the following construction sites:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
- Harrogate Road at the junction with the A659, Harewood.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate’s services to Leeds, York and Knaresborough are all expected on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.45am
Roads
Traffic is building around the following construction sites:
- Skipton Road, Harrogate – particularly on the way into the town centre.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate’s services to Leeds, York and Knaresborough are all expected on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.30am
Roads
- Congestion is starting the build this morning, particularly from Knaresborough into Harrogate, Leeds Road into Harrogate and on Skipton Road.
- Traffic is building around the following construction sites:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate’s services to Leeds, York and Knaresborough are all expected on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7.15am
Roads
- Congestion is starting the build this morning, particularly in Harrogate
- Traffic is mainly building around construction sites in Harrogate and Knaresborough:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate’s services to Leeds, York and Knaresborough are all expected on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 7am
Roads
- The roads are still looking clear around the Harrogate district this morning. We have had no reports of road closures or crashes so far.
- Construction sites are already causing congestion in Harrogate and Knaresborough:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate’s services to Leeds, York and Knaresborough are all expected on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 6.45am
Roads
- The roads are still looking clear around the Harrogate district this morning. We have had no reports of road closures or crashes so far.
- Construction sites are already causing congestion in Harrogate and Knaresborough:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
Trains
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds services are on time.
Buses
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
Full update – 6.30am
- The roads are looking clear around the Harrogate district this morning. We have had no reports of road closures or crashes so far.
- Construction sites are likely to cause congestion in Harrogate and Knaresborough:
- Skipton Road, Harrogate.
- Knaresborough Road, near to the Empress Roundabout.
- Leeds Road, near to Crimple Hall and Leeds Road Roundabout.
- High Street in Knaresborough.
- The trains are running well this morning with no cancellations or delays. Harrogate to Leeds services are on time.
- Buses also appear to be running well in the Harrogate district with no delays or cancellations.
